Metrics
Group-wide environmental Key Performance Indicators
Metric | 2016 | 2017 | Comments |
---|---|---|---|
1.Not counted in the total GHG emissions of 69,378 tonnes.
|
|||
Energy consumption (Gigajoules (GJ)) | 628,000 | 1,045,257 | Energy consumption increased due to increase of activities including:Bualuang and Cote d’Ivoire drilling, Kerendan 3D survey, Kerendan gas plant condensate evacuation and Malaysia 3D survey. |
Energy Intensity (GJ/mboe) | 1.4 | 1.8 | Value for E&P companies reporting to IOGP is 1.4 (2016). Increased value due to increased 2017 activities outlined above. |
Emissions (tonnes of CO2e): – Direct (Scope 1) |
64,055 63,624 |
94,493 94,124 |
Scope 1 and 2 emissions increased due to activities outlined above.2016 Scope 2 emissions revised down by 75 units due to double counting energy consumption in Thai offices. |
– Energy Indirect (Scope 2) | 431 | 369 | |
– Other Indirect (Scope 3)1 | 1,751 | 6,404 | Scope 3 is emissions from business air travel only |
CO2 emissions intensity (tonnes CO2e per thousand tonnes oil equivalent production) | 144 | 162 | Average value for E&P companies reporting to IOGP is 151 (2016). Increased value due to increased 2017 activities outlined above. |
Flaring (MMscf) | 214 | 38 | All flaring at KGPF due variation in customer demand. No continuous flaring. |
Venting (MMscf) | 15.9 | 15.4 | At the Bualuang field, a small amount of gas is produced along with the oil. This gas is continuously vented to the atmosphere |
Water withdrawn for use (m3) | 5,915 | 4,283 | Kerendan operations only. |
Waste (kg): – Hazardous – Non-hazardous |
20,539 69,343 |
24,890 1,378,645 |
Bualuang and Kerendan operations. Waste generation increased due to Bualuang and Cote d’Ivoire drilling, Kerendan and Malaysia 3D surveys. |
Oil and chemical spills | None | < 1 boe | Two cases of incidental spills to secondary containment. |
Oil and chemical spills – released to the environment | None | None | |
Loss of containment events | None | None | |
Produced water discharged (tonnes) | No produced water discharged | No produced water discharged | All water at the Bualuang field is re-injected into the reservoir; produced water at KGPF is being stored for future re-injection, anticipated to commence 2018. |