Metrics

Group-wide environmental Key Performance Indicators

 

 

Metric 2016 2017 Comments

1.Not counted in the total GHG emissions of 69,378 tonnes.

Energy consumption (Gigajoules (GJ)) 628,000 1,045,257 Energy consumption increased due to increase of activities including:Bualuang and Cote d’Ivoire drilling, Kerendan 3D survey, Kerendan gas plant condensate evacuation and Malaysia 3D survey.
Energy Intensity (GJ/mboe) 1.4 1.8 Value for E&P companies reporting to IOGP is 1.4 (2016). Increased value due to increased 2017 activities outlined above.
Emissions (tonnes of CO2e):
– Direct (Scope 1)
64,055
63,624
94,493
94,124
Scope 1 and 2 emissions increased due to activities outlined above.2016 Scope 2 emissions revised down by 75 units due to double counting energy consumption in Thai offices.
– Energy Indirect (Scope 2) 431  369
– Other Indirect (Scope 3)1 1,751  6,404 Scope 3 is emissions from business air travel only
CO2 emissions intensity (tonnes CO2e per thousand tonnes oil equivalent production) 144 162 Average value for E&P companies reporting to IOGP is 151 (2016). Increased value due to increased 2017 activities outlined above.
Flaring (MMscf) 214 38 All flaring at KGPF due variation in customer demand. No continuous flaring.
Venting (MMscf) 15.9 15.4 At the Bualuang field, a small amount of gas is produced along with the oil. This gas is continuously vented to the atmosphere
Water withdrawn for use (m3) 5,915 4,283 Kerendan operations only.
Waste (kg):
– Hazardous
– Non-hazardous
 
20,539
69,343
 
24,890
1,378,645
Bualuang and Kerendan operations. Waste generation increased due to Bualuang and Cote d’Ivoire drilling, Kerendan and Malaysia 3D surveys.
Oil and chemical spills None < 1 boe Two cases of incidental spills to secondary containment.
Oil and chemical spills – released to the environment None None
Loss of containment events None None
Produced water discharged (tonnes) No produced water discharged No produced water discharged All water at the Bualuang field is re-injected into the reservoir; produced water at KGPF is being stored for future re-injection, anticipated to commence 2018.